Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

BIRCH HILL BICYCLE and PEDESTRIAN FACILITY ROAD CONSTRUCTION through early June
What You Need to Know
  • The bike path is expected to be CLOSED for a short period at the beginning of the summer.
Contractor Information

HC Contractors, Inc

Contractor Number
907-488-5983
DOT Hotline
703-350-2880

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers